Description
SolarEdge Power optimiser P3700 gives PV power optimisation at the module-level but it give you also more energy (+25%) with its superior efficiency of 99.5%. The installation is fast with a single bolt. SolarEdge Power optimiser P370 lets you to do panel-level monitoring of high power 60-cell and 72-cell panels. It mitigates all types of modules mismatch-loss, from manufacturing tolerance to partial shading. Thanks to flexible system design you can have maximum space utilisation. It is next generation maintenance with module level monitoring. Module-level voltage shutdown for installer and firefighter safety.
About SolarEdge
Founded in 2006, SolarEdge established the DC power optimiser segment and is leading it with over 70% market share. By Q2 2012, SolarEdge has shipped over 1,000,000 power optimisers to more than 30 countries worldwide. With strategic partnerships across the PV value-chain from module manufacturers to integrators, SolarEdge installations can be found in five continents.
Please note that all prices are exclusive of GST
Intercompatibility Notes Datasheet Website Warranty Quick Installation Guide
Installation Manual 2 Installation Manual 3 Installation Manual 4